Wallpaper usage purpose and construction of the basement membrane Publisher: Browse 4115 Published:26/9/2012 Print |
||||||||||||||
The moistureproof Wallpaper basement membrane is a professional anti-alkali, moisture, mildew wall treatment materials, can effectively prevent the construction of the base surface moisture moisture and alkaline substances extravasation, avoid wall decoration materials: such as wallpaper, paint layer, plywood, decorative panels damp, moldy black bad damage. Professional moisture-proof film is developed from water-based high-tech materials, no adverse volatile gases harmful to humans, the environment, compared to the traditional oil-based alkyd varnish, effective protection of the indoor environment, and more than oil-based alkyd varnish extend the useful life of three to five times. Damp proof membrane with a flexible molecular materials, but also in the case of wall micro-cracks effectively protect your wall. Wallpaper base film usage purposes: 1. Wallpaper, wall covering, decorative plates the base surface Gechao mildew Damp proof membrane matching wallpaper, wall covering, high-end decorative plates base surface protection processing materials, the construction of the base surface moisture and alkaline substances can effectively prevent extravasation in the construction of the base surface spray or brush one to two, and then laying wallpaper , plywood, etc. 2. Interior wall moisture, bathroom, kitchen and ground moisture-proof Eradicate mildew, loose from the shell to the base, can wipe with waterproof mortar Calibrating. If the new the ordinary mortar walls, floors, you should spray, brush two times a damp proof membrane. Bathroom, kitchen and laying tile, low brick in the processing, then, can effectively prevent water seepage and moisture barrier. 3. Cement floors, wooden floors Gechao Cement floor dries up, nailed wooden joists after spray, brush two times a damp proof membrane, to cut off groundwater traced capillaries, effectively prevent the floor from moisture invasion. Wallpaper base film construction conditions and the amount of: 1). The proposed construction of a new look plot: per liter stock solution can be watered from 60% to 80%, the construction area of approximately 20 to 25 square feet. 2). The product table dry time is about 1 hour, hard work 24 hour interval of 3 to 5 hours after each pass construction, Can be constructed 3). The minimum temperature is less than 5 degrees, and is prohibited when the construction. 4). Transportation and storage: non-hazardous goods storage and transportation. Storage conditions: 0 to 40 degrees Celsius, put in the drying chamber. |
||||||||||||||
Previous: Proper maintenance of wallpaper and wall covering in the home | Next: Posted wallpaper concrete steps |
||||||||||||||
|
||||||||||||||
Back |
Links: 墙纸胶 糯米胶 墙纸粉 墙布胶 进口日本胶 防潮基膜 win10系统 墙纸辅料国内十大品牌 墙布胶 广东墙纸生产厂家
网址:www.jmcmj.com 墙纸粉 进口日本胶 墙布胶 防潮基膜
You are No. Visitors